Missouri State University

FY 2003
PROPOSED (6-10 YEARS)


MAINTENANCE BUILDING

This proposed facility of 5,184 square feet will provide sheltered storage space for existing and future field research equipment and expanded shop area.

FRUIT SALES BUILDING
This proposed facility will include a storefront sales area with adjoining cooler and apple grading area. It will serve as an example of a sales and storage area suitable for small direct market producers. The building will be used for the sale of extra fruit from the research and demonstration plantings, and will be featured on the annual elementary school tours.

PARKING AND CIRCULATION
A proposed parking lot south of Shepard Hall and east of the Classroom Building will provide spaces for shared use of the facilities. The present Vehicle Storage Building will be relocated to the east side of the campus creating a central service area while accommodating the parking lot. A second proposed parking lot west of Highway 95 will provide parking for staff and the public visiting the Horticulture Demonstration Area and proposed Fruit Sales Building. The proposed relocated road will replace the primarily one-way road and create two-way access throughout the campus. The proposed addition of sidewalks will further enhance circulation and safety on campus.